SPF Timeline

1986

The Chairman & Sole owner of Saudi Pump Factory  (SPF),      Mr. Nabil H. Al-Hashim signs a technical agreement and license to manufacture pumps, with Thyssen Maschinenbau Ruhrpumpen GmbH of Germany.


1987

SAUDI PUMP FACTORY is officially launched and the latest CNC lathes and Machining Centers are installed making SPF one of the most technology-advanced manufacturing facilities for pumps.


1988

Production commences. The largest pump testing facility in the Middle East is put in place with capabilities of testing pumps up to 500 kW.


1989

The development of the Vertical Turbine Pump range is completed.


1990

SPF develops a new line of pipes for the deep-well agricultural industry under the name of “2-Seal Pipes”. It is made to answer the problems of corrosion that were being faced by farmers throughout Saudi Arabia. The new system gives a water-tight protection to the threads of the pipes.


1991

SPF signs a license agreement with Aurora Pump of the USA to manufacture a wide range of End Suction & Split Cage pumps for the building, municipal and fire fighting services.


1992

SPF further improves the 2-Seal Pipes into the all new “4-Seal design” solely developed at SPF. The pipes withstand pressures in excess of 50 bars without leak. SAUDI PUMP FACTORY expands its facilities by adding a new CNC Machining Center capable of running 36 hrs. unmanned.


1993

SPF signs a license agreement with the David Brown Union Pumps Ltd. of the U.K. to manufacture American Petroleum Institute (API) Pumps in the Saudi Arabia. SPF becomes the first and only one in the Middle East to manufacture pumps to the American Petroleum Institute (API) standards.


1994

SPF signs a license agreement with Bopp & Reuther Valves (VAG) of Germany to begin manufacturing valves for the water industry. An Electro-powder Coating facility is installed to meet standards of coating for potable water.


1995

SPF obtains ISO 9002 certification and becomes the first pump manufacturer in the Middle East to obtain this recognition for quality. SAUDI PUMP FACTORY adopts the “Pumps & Valves” insignia under its name.


1996

Saudi Pump Factory becomes the first and the only local approved manufacturer/supplier for Saudi Aramco within the Middle East.


1997 - 1998

An ANSI pump range is commissioned for development to meet the needs of the chemical, oil and gas markets. The line is called “ANSI Plus”..


1999

A new Division in SPF is launched under the name of Precision Engineering Technologies (PET) to offer SPF’s manufacturing service capabilities for sub-contract. Many international prestigious contracts are won.


2000

SPF further upgrades its testing capabilities upto 1-megawatt giving further substance to its already state-of-the-art manufacturing and servicing capabilities.


2001

The first order for “ANSI Plus” Pump is executed and delivered to Aramco.


2002

String Test of Multistage Pump at different Speeds conducted at SPF Test Stand using Variable Speed Drives supplied by ABB. The systems are installed in Aramco Haradh Gas Project.


2004

Saudi Pump is approved by Saudi Aramco to Package Horizontal Multistage Pumps and other Pumps of higher Capacity that are not in the manufacturing range of Saudi Pump.


2005

Sump Pumps of Type API 610- VS4 developed and first batch of pumps supplied and installed at Saudi Aramco, Yanbu


2006

Fire Water Pumps, mounted on Loading Platform, drawing water from sea, supplied and installed at Ras Tanura Sea Islands (Loading Platforms). The Pumps are Vertical Sump Pumps having length of 15 meters.


2008

Design Department is enhanced and Design and Development is now included in ISO 9001 Certification.


2009

Quality Management System is upgraded and Certified conforming to ISO 9001-2008. Quality Management System upgraded including Compliance to ISO/TS 29001.

Saudi Pump entered in to license agreement with Schafer & Urbach, Germany to manufacture positive displacement pumps according to API 674 and Process for Aramco approval started.

UL approval for spilt case pumps process started.

PMI machine added in our facility to do material inspection.


2010

Manufacturing facilities upgraded adding additional machines; CNC Vertical Lathe, CNC Horizontal Machining Center, Radial Drill, Cylindrical Grinding machine, Centerless Grinding Machine, Shaft Straightening Machine, Plasma Machine, Bar Peeling Machine, Bandsaw, 10 Ton Overhead crane etc.   

Upgradation of Test Facilities with 4 MW Power started.

Saudi Pump entered in to license agreement with Enpro Industries to manufacture Lube Oil Systems. Building, Manufacturing and Test Facilities provided and Process for Aramco approval started.

First Major Contract to GS Engineering, Korea for Aramco Manifa Project successfully executed.